Model | Path Efficiency = (Intercept) + (Cf)Controller + (Cw0/w1)Week | ||
---|---|---|---|
Coefficient Estimate | Std. Error | p | |
(Intercept) | 66.9 | 2.3 | ≪0.001 |
ControllerCoefficient Cf 0-Intact, 1-KNN | −21.8 | 2.7 | ≪0.001 |
Controller:Week Cw0 (Intact) | 3.4 | 1.6 | 0.03 |
Controller:Week Cw1 (KNN) | 0.6 | 0.2 | 0.002 |